Operating Regulations of Large-Circle High-speed Paper Cutter---Fujian Large-Circle Paper Cutter
: admin: 2021-07-05 16:07:43: 41
Operating Regulations of Large-Circle High-speed Paper Cutter---Fujian Large-Circle Paper Cutter
1. Before starting the machine, the surface and the inside of the machine must be sanitized to thoroughly remove the paper scraps. And check the lubrication system, paper cutter, etc. for looseness or abnormality. ---Fujian Large Swivel Paper Cutter
2. Run at low speed for a few minutes after starting the machine, adjust the air pressure to 0.3-0.5mpa, and check whether the four doors are closed tightly and there is no major problem.
3. Read the production notice carefully and produce according to the required specifications.
4. Check the paper roll at any time for wrinkles, burrs, bumps, yellowing, blackening and length inconsistencies on the end surface at any time during production, and make timely adjustments once it appears. ---Fujian Large Swivel Paper Cutter
5. To lift the cutter head by hand wheel, you need to loosen the M16 screws on the cutter head support first, and tighten the screws after lifting it in place.
6. When replacing a new blade, the cutter head must be raised to the highest position. After the blade is changed, the cutter must be checked for collision with the bottom before the machine can be turned on.
7. When the sharpening sound is abnormal, and the blade is very hot, you need to stop the machine to check whether the grinding wheel is blocked, and clean or replace with a new grinding wheel. It should be noted that the pressure of the grinding wheel on the blade should be light, too much pressure will cause damage to the cutter. ---Fujian Large Swivel Paper Cutter
8. When replacing the push palm, you need to measure the distance between the push palms and determine the position to tighten the screws.
9. The position of the photoelectric switch of the paper guide slot should not be changed by non-professionals without special circumstances, otherwise the cutter will be damaged.
10. After the shift, the site must be cleaned to keep it tidy, stop the operation of machinery, and cut off the power supply.